PROPERTY

1 Kingdom Street


ACHIEVEMENTS

We established a new controls regime, setting up 3 understandable modes of operation that led to the system coming in to operation automatically depending on outdoor and indoor temperatures. Importantly, we prevented bacteriological growth by further control modifications that automatically circulates water in unused branches overnight. The geothermal system now enhances the green credential of the premises as was originally intended.


Focus FM analysed the water circuits in this large system, which are in four stages, determined how their performance could be improved and specified rectification measures to ensure their long-term operation. The initial works replaced failed equipment, installed new filters and removed dead legs from the system. We then rebalanced each circuit to ensure correct flow rates, and prevented energy waste by controlling pump speeds and revising the changeover from heating to cooling set up.

In the final stage, we reviewed and overhauled the system’s control strategy in a clear, open manner so that it will be readily understandable to future users. These modified circulation routes automatically select whether they are heated or cooled dependent on circuit water, room and outdoor temperature and avoiding condensation. We also developed a new control mode that automatically facilitated specific water circulation routines overnight, which ensure bacteria is prevented from developing in each part of every circuit.

Get in Touch